Send An Enquiry to Flowservices

Learn more about Flowservice

Key Outcomes 

  • Much higher accuracy and repeatability achieved with non-intrusive clamp-on technology compared to the previously installed open channel meter
  • 3 to 4 times more cost effective than in line flow meter options
  • Maintenance-free with no moving parts or water contact
  • Better measurement performance than the other clamp-on flow meters tested by the customer
  • Ability to offer 80 m sensor cable without need of a junction box
  • Great local service and support through Flowservices (FLEXIM distributor)

Business Problem 

mid-coast-water.png

The only double delta river in the southern hemisphere, the Manning River is the lifeblood of the Manning Water Supply Scheme. From the river water is piped to Bootawa Dam where it is stored before being transferred into the water treatment plant for processing. Bootawa Dam has the capacity to hold 2,275 million litres of water and covers a 26.3 hectare storage area.

The Bootawa Water Treatment Plant delivers a world class standard of water to the community it serves. The membrane filtration plant is capable of processing up to 60 million litres of water per day, with a provision for further upgrading to 75 megalitres when required. The plant is fully automatic and monitored by advanced SCADA technology.
 
MidCoast Water wanted to improve the flow monitoring of water that was pumped from their Bootawa dam to the Bootawa Water Treatment Plant. Previously, MidCoast Water had been using an open channel meter located at a flume within the water treatment plant to monitor the flow. But the accuracy of the system was unsatisfactory, especially at times of low flows. Therefore they began looking for alternative technologies with which to achieve a more reliable and accurate measurement of water entering the treatment plant.
Initially, MidCoast Water considered installing a magmeter on the 1221 mm mild steel transport line leading from the reservoir to the treatment plant. But a magmeter of the required size would have been expensive and the installation process very labor-intensive. Instead, a more elegant and cost-efficient method was identified in the form of clamp-on ultrasound flow measurement.

The Flowservices Solution 

MidCoast Water trailed clamp-on flow meters from several suppliers, but only Flowservices could satisfy their demands with regards to performance of the meter, and especially stability of the measurements. A further factor that influenced MidCoast Water’s purchase decision was the excellent support given by Flowservices.

The Flowservices solution provided a cost-effective and highly accurate flow monitoring system. The media was water flowing through a drinking water trunk main that is 1221 mm (48’’) (outer diameter) and mild steel (12 mm) with concrete lining (18 mm). The instruments used is a fixed ultrasound flow meter model FLUXUS® F704 with CDK transducers using an 80m sensor cable.

Contact Flowservices to discuss your next flow measurement challenge.
 

 

 

Related Projects

Financial incentives for chiller upgrade Art Gallery of New South Wales

Key outcomes
Energy Conservation’s Measurement and Verification (M&V) and certificate creation services enabled the Art Gallery of New South Wales to achieve:  

  • Funding of over $100,000 through the creation of more than 12,000 Energy Savings Certificates under NSW Energy Savings Scheme (ESS).  
  • Accurate determination of annual savings of 1,200 Megawatt-hoursrepresenting 15% of Gallery consumptionThis equates to annual savings of $140,000 in energy costs and over 1200 tonnes of CO2 equivalent emissions

View Case Study

Evo Energy Turns Heat Green at WhiteWater World

Key Outcomes

  • Reduction in running costs by over 70% 

  • Reduction in carbon emissions by over 35%

Evo Energy installed the largest heat pump system in Australia, with a cutting-edge system upgrade at the popular tourist theme park, WhiteWater World, delivered unparalleled energy efficiencies and helped reduce carbon emissions.

View Case Study

Evo Energy Helps Rivalea to Reduce Environmental Footprint with Custom-Built Biogas Generator

Key Outcomes

  • Generates around 25% of the site’s power per year
  • Offsets over 28,000 per annum tons of CO2 equivalent emissions from grid
  • Methane emissions avoided
  • Energy efficiency of up to 90%

Rivalea, one of Australia’s leading agri-food companies, partnered with Evo Energy minimise their environmental footprint and reduce energy consumption, with the installation of a custom-built biogas generator. 

View Case Study

Cogeneration Heating Aquatic Centre

Key Outcomes
  • $111,000 per year in energy costs
  • 1,224 tonnes in greenhouse gas emissions per year (or the equivalent annual emissions of over 300 cars).
​​Project Summary

The Cardinia Life health and recreational facility was responsible for a largest portion of greenhouse gas emissions in the the Cardinia district (Victoria). Evo Energy Technologies provided a solution which included an update to the facilties while maximumising energy efficiency and achieving cost savings.

View Case Study

Meat Production Turning Waste Into Biogas

Key Outcomes

  • Total project value: €3 million
  • ​Implementation of biogas plant where no source of existing anaerobic bacteria was available
  • Full operating load being digested into biogas plant
  • Significant reduction in greenhouse gas, odour emissions and solid waste disposal
  • 70% reduction in bunker oil consumption and market exposure
The Project

Finn Biogas worked with their client to build an on-site biogas plant converting manure, rumen content, fatty waste and blood into biogas which is now used to fire an on-site boiler for rendering operations. 

 

View Case Study

Ingham reaps benefits of energy management focus

Key Outcomes 

  • 6% energy savings in 12 months
  • reduced maintenance and labour costs

In just under 12 months, Ingham’s management and operations staff, with guidance from Energetics, collaborated to achieve energy consumption savings across the business of 6% - a significant accomplishment for an energy management program’s first year. 

When compared with resource management programs for similar sized organisations, which typically build up 10% to 15% savings over five to eight years, the result places this iconic poultry producer as a top performer.  

View Case Study

Do you have a smart technology or solution?

Let the business community know about it!

Get in touch