Key Outcomes

  • 25% energy and carbon reduction
  • $356k energy efficiency funding
  • Cash flow positive ROI in excess of 7%

Summary of Business Target

The City of Fremantle has ambitious carbon reduction goals of all buildings and structures (including street lighting and stationary energy sources) within its the operational control to be net zero carbon by 2020; powered and heated by a combination of on and off site renewable energy. A major facility in the City's portfolio is the Fremantle Leisure Centre. The Centre's pool heating system needed to be upgraded providing an ideal opportunity to reduce energy consumption, cost and carbon emissions. The City began researching technology that could help achieve their goals and put the project out to tender. 

 

EvoHeat's solution 

Pool heating specialist Evoheat (part of EvoET) were successful with their bid to supply and install a water-to-water heat pump for the geothermal heating system and cogeneration system. This unique, turn key solution is the first of its kind in Australia combining cogeneration with a shallow aquifer geothermal heat pump. The result is much higher Co-efficient Of Performance (COP), superior energy efficiency and a much lower running cost.
Evo Heat EVO MiracleGen Combined Heat and Power system
A 350 kW EVO water-to-water heat pump was selected. This unit draws water from the Leederville aquifer 250m below the ground. The water, which exits the aquifer at around 27°C, is passed through the heat pump and then re-injected back into the aquifer via a separate injection bore. The thermal energy harvested from underground water is used to heat two of the centre’s swimming pools. A notable achievement of this system is the impressive COP of over 6.0 year round. The technology pushes the boundries and begs the question of aging pool heat pumps which typically operate at COPs between 2.5 and 3.8.

The other key component in this geothermal heating system is the cogeneration unit. Evoheat supplied and installed an EVO MiracleGen Combined Heat and Power (CHP) system that will generate 75 kW of electricity for the facility and 120 kW of heat for the pools. The cogeneration system’s Cummins gas engine will be serviced and maintained by Cummins once every two months. Its long service life means it is expected to operate for 10 to 15 years before it requires a major overhaul, according to Evoheat’s Travis McNeill.

The heat pump is also low-maintenance requiring just an annual inspection. It has a projected life expectancy of 25 years.

Sam Bryce of City of Fremantle, "This is a bespoke, cutting-edge project - for Australia in general, let alone a local council". 

Send an enquiry to EVO Energy Technology.

 

 

Related Projects

Financial incentives for chiller upgrade Art Gallery of New South Wales

Key outcomes
Energy Conservation’s Measurement and Verification (M&V) and certificate creation services enabled the Art Gallery of New South Wales to achieve:  

  • Funding of over $100,000 through the creation of more than 12,000 Energy Savings Certificates under NSW Energy Savings Scheme (ESS).  
  • Accurate determination of annual savings of 1,200 Megawatt-hoursrepresenting 15% of Gallery consumptionThis equates to annual savings of $140,000 in energy costs and over 1200 tonnes of CO2 equivalent emissions

View Case Study

Evo Energy Turns Heat Green at WhiteWater World

Key Outcomes

  • Reduction in running costs by over 70% 

  • Reduction in carbon emissions by over 35%

Evo Energy installed the largest heat pump system in Australia, with a cutting-edge system upgrade at the popular tourist theme park, WhiteWater World, delivered unparalleled energy efficiencies and helped reduce carbon emissions.

View Case Study

Evo Energy Helps Rivalea to Reduce Environmental Footprint with Custom-Built Biogas Generator

Key Outcomes

  • Generates around 25% of the site’s power per year
  • Offsets over 28,000 per annum tons of CO2 equivalent emissions from grid
  • Methane emissions avoided
  • Energy efficiency of up to 90%

Rivalea, one of Australia’s leading agri-food companies, partnered with Evo Energy minimise their environmental footprint and reduce energy consumption, with the installation of a custom-built biogas generator. 

View Case Study

Cogeneration Heating Aquatic Centre

Key Outcomes
  • $111,000 per year in energy costs
  • 1,224 tonnes in greenhouse gas emissions per year (or the equivalent annual emissions of over 300 cars).
​​Project Summary

The Cardinia Life health and recreational facility was responsible for a largest portion of greenhouse gas emissions in the the Cardinia district (Victoria). Evo Energy Technologies provided a solution which included an update to the facilties while maximumising energy efficiency and achieving cost savings.

View Case Study

Who can accurately measure flow without cutting the pipe? Flowservices can

Key Outcomes 

  • Much higher accuracy and repeatability achieved with non-intrusive clamp-on technology compared to the previously installed open channel meter
  • 3 to 4 times more cost effective than in line flow meter options
  • Maintenance-free with no moving parts or water contact
  • Better measurement performance than the other clamp-on flow meters tested by the customer
  • Ability to offer 80m sensor cable without need of a junction box
  • Great local service and support through Flowservices (FLEXIM distributor)

Business Problem 

MidCoast Water wanted to improve the flow monitoring of water that was pumped from their Bootawa dam to the Bootawa Water Treatment Plant. They engaged Floservices to design a cost-efficient solution in the form of clamp-on ultrasound flow measurement.

View Case Study

Meat Production Turning Waste Into Biogas

Key Outcomes

  • Total project value: €3 million
  • ​Implementation of biogas plant where no source of existing anaerobic bacteria was available
  • Full operating load being digested into biogas plant
  • Significant reduction in greenhouse gas, odour emissions and solid waste disposal
  • 70% reduction in bunker oil consumption and market exposure
The Project

Finn Biogas worked with their client to build an on-site biogas plant converting manure, rumen content, fatty waste and blood into biogas which is now used to fire an on-site boiler for rendering operations. 

 

View Case Study