Send An Enquiry to Evo Energy Technologies

Key Outcomes

  • Reduction in running costs by over 70% 

  • Reduction in carbon emissions by over 35%


Business Problem

Dreamworld’s sister park, WhiteWater World is one of Australia’s largest water park attractions. Located in
Queensland’s premier holiday destination of the Gold Coast, the park hosts over half a million guests each year. The efficient use of water represents one of WhiteWater World’s greatest challenges, as does heating their water-themed attractions throughout the year. The energy costs associated with heating areas such as their 2,685 square metre wave pool, are understandably astronomical. WhiteWater World were in need of a solution which could adequately heat their water park, while also reducing running costs and emissions. 


Evo Energy’s Solution

In March 2017, Evo Energy commenced the installation of the largest heat pump system in Australia, with a cutting-edge system upgrade at the popular tourist theme park, WhiteWater World.

Co-located with the  Dreamworld site, the WhiteWater World water park now features ground breaking heat pump technology that delivers reliable, energy efficient water heating to hundreds of thousands of guests every year.  

IMG_9515.jpg
 

Evo Energy’s redesign heats over 30 slides, water-rides and pools to 26 degrees all year round, using 19 high-performance EvoHeat CS200-GEN2 heat pumps.  

The 19 EvoHeat CS200-GEN2 heat pumps provide up to 3,610kW heating capacity, delivering unparalleled energy efficiencies that save WhiteWater World over 70 per cent on their running costs, compared to their existing gas boiler system.  The EvoHeat heat pump technology has also cut WhiteWater World’s carbon emissions by over 35 per cent. 

The system upgrade now allows WhiteWater World to remotely control and monitor their water heating capabilities using the technology’s smart controller system.

 

Send an enquiry to EVO Energy Technology.
 

 

Related Projects

Financial incentives for chiller upgrade Art Gallery of New South Wales

Key outcomes
Energy Conservation’s Measurement and Verification (M&V) and certificate creation services enabled the Art Gallery of New South Wales to achieve:  

  • Funding of over $100,000 through the creation of more than 12,000 Energy Savings Certificates under NSW Energy Savings Scheme (ESS).  
  • Accurate determination of annual savings of 1,200 Megawatt-hoursrepresenting 15% of Gallery consumptionThis equates to annual savings of $140,000 in energy costs and over 1200 tonnes of CO2 equivalent emissions

View Case Study

Evo Energy Helps Rivalea to Reduce Environmental Footprint with Custom-Built Biogas Generator

Key Outcomes

  • Generates around 25% of the site’s power per year
  • Offsets over 28,000 per annum tons of CO2 equivalent emissions from grid
  • Methane emissions avoided
  • Energy efficiency of up to 90%

Rivalea, one of Australia’s leading agri-food companies, partnered with Evo Energy minimise their environmental footprint and reduce energy consumption, with the installation of a custom-built biogas generator. 

View Case Study

Cogeneration Heating Aquatic Centre

Key Outcomes
  • $111,000 per year in energy costs
  • 1,224 tonnes in greenhouse gas emissions per year (or the equivalent annual emissions of over 300 cars).
​​Project Summary

The Cardinia Life health and recreational facility was responsible for a largest portion of greenhouse gas emissions in the the Cardinia district (Victoria). Evo Energy Technologies provided a solution which included an update to the facilties while maximumising energy efficiency and achieving cost savings.

View Case Study

Who can accurately measure flow without cutting the pipe? Flowservices can

Key Outcomes 

  • Much higher accuracy and repeatability achieved with non-intrusive clamp-on technology compared to the previously installed open channel meter
  • 3 to 4 times more cost effective than in line flow meter options
  • Maintenance-free with no moving parts or water contact
  • Better measurement performance than the other clamp-on flow meters tested by the customer
  • Ability to offer 80m sensor cable without need of a junction box
  • Great local service and support through Flowservices (FLEXIM distributor)

Business Problem 

MidCoast Water wanted to improve the flow monitoring of water that was pumped from their Bootawa dam to the Bootawa Water Treatment Plant. They engaged Floservices to design a cost-efficient solution in the form of clamp-on ultrasound flow measurement.

View Case Study

Meat Production Turning Waste Into Biogas

Key Outcomes

  • Total project value: €3 million
  • ​Implementation of biogas plant where no source of existing anaerobic bacteria was available
  • Full operating load being digested into biogas plant
  • Significant reduction in greenhouse gas, odour emissions and solid waste disposal
  • 70% reduction in bunker oil consumption and market exposure
The Project

Finn Biogas worked with their client to build an on-site biogas plant converting manure, rumen content, fatty waste and blood into biogas which is now used to fire an on-site boiler for rendering operations. 

 

View Case Study

Ingham reaps benefits of energy management focus

Key Outcomes 

  • 6% energy savings in 12 months
  • reduced maintenance and labour costs

In just under 12 months, Ingham’s management and operations staff, with guidance from Energetics, collaborated to achieve energy consumption savings across the business of 6% - a significant accomplishment for an energy management program’s first year. 

When compared with resource management programs for similar sized organisations, which typically build up 10% to 15% savings over five to eight years, the result places this iconic poultry producer as a top performer.  

View Case Study

Do you have a smart technology or solution?

Let the business community know about it!

Get in touch